Non-structural adhesive bonding |
|
|
|
|
|
|
|
|
|
|
AIPI 06-02-002, AIPS 06-02-002
|
Structural bonding of thermoset and thermoplastic matrices compocite parts |
|
|
|
|
|
|
|
|
|
|
AIPI 06-02-006, AIPS 06-02-006
|
Manufacture of monolithic parts with thermoset prepreg materials |
|
|
|
|
|
|
|
|
|
|
AIPI 03-02-019, AIPS 03-02-019
|
Manufacture of structural sandwich parts with thermosetting fibre reinforced skins |
|
|
|
|
|
|
|
|
|
|
AIPI 03-02-018, AIPS 03-02-018
|
Manufacture of Reference standards for non-destructive inspection methods on fibre composites |
|
|
|
|
|
|
|
|
|
|
|
Installation of parallel shank threaded fasteners |
|
|
|
|
|
|
|
|
|
|
AIPI 01-02-022, AIPS 01-02-022
|
Wet installation of fasteners |
|
|
|
|
|
|
|
|
|
|
AIPI 05-05-004, AIPS 05-05-004
|
Machining of fibre reinforced plastic (FRP) components |
|
|
|
|
|
|
|
|
|
|
AIPI 03-07-002, AIPS 03-07-002
|
General assembly and installation of fasteners |
|
|
|
|
|
|
|
|
|
|
AIPI 01-02-017, AIPS 01-02-017
|
Torque tightening of screws, bolts and nuts |
|
|
|
|
|
|
|
|
|
|
AIPI 01-02-008, AIPS 01-02-008
|
Surface preparation for thermosetting parts before structural bonding |
|
|
|
|
|
|
|
|
|
|
AIPI 06-01-003, AIPS 06-01-003
|
Mechanical surface preparation of non-structural adherend prior to adhesive bonding |
|
|
|
|
|
|
|
|
|
|
AIPI 06-01-004, AIPS 06-01-004
|
Preparation of holes in fibre reinforced plastic (FRP) and hybrid materials |
|
|
|
|
|
|
|
|
|
|
AIPI 01-02-005, AIPS 01-02-005
|